Industrial Applications
Editorial: reporter-observed public cinema task supports a specific bounded service deployment. It does not establish exact retail variant, independently audited long-term uptime, food-handling approval or readiness for unrelated manufacturing tasks.
This editorial assessment concerns industrial buyer readiness. It is not an independent performance test.
| EU regulatory fit | Unknown |
|---|---|
| Cybersecurity fit | Unknown |
| Serviceability fit | Unknown |
| Supply chain fit | Unknown |
Manipulation and Perception
Guangzhou Daily reporter observed cinema popcorn cup handling, ordering and recovery after container displacement. Reported 14 h/1000 cups/zero-error site-test figures lack logs, observation duration, charging and intervention accounting; not a pack-endurance or whole-fleet reliability rating.
Dobot-VLA visual/language/action task reasoning is maker-attributed; reporter observed selected recovery behaviour. Sensors, computer, network assistance and exact software build of the deployed unit unknown.
SDK and Integration
Deployment article does not establish customer-owned SDK/API, licence or offline autonomy entitlements. Current public ATOM repositories are separate family evidence.
| API type | Exact model / firmware entitlement unverified |
|---|---|
| Languages | Needs verification |
| ROS support | Exact configuration compatibility unverified |
| Simulation | Exact configuration/controller compatibility unverified |
| Offline operation | Local control claims do not establish full AI operation without network or licence servers |
| Teleoperation | Exact controller/VR options and access depend on configuration. |
| Software updates | Version support, signed updates and rollback unverified |
| Documentation | Open documentation |
| Integration constraints | Obtain delivered controller, network, licence and release matrix before integration. |
No inferred universal open-source licence or production reliability.
Safety Notes
No signed exact-model EU declaration, complete safety technical file, verified stopping distance/force limits or independent stability validation inspected. Cobot certificates do not establish humanoid conformity. Assess the full application and protective measures.
Compliance and Certificates
| Standard | Status | Jurisdiction | Evidence |
|---|---|---|---|
| CE marking | Unknown | European Union | No signed exact-model declaration or complete technical file inspected; do not transfer DOBOT cobot approvals. |
Commercial Readiness
| Pricing | March 18, 2025 original ATOM China pre-sale started CNY 199000 according to maker page posted March 25. Historical family offer, not a current quote or price for this undisclosed K 11 configuration. |
|---|---|
| Price range | Quote-based or unverified |
| Lead time | Needs verification |
| Availability regions | China / international supplier inquiry; exact SKU by contract |
| Spare parts | No exact EU stock or repair SLA verified; request battery, drive, hand, sensor/controller spares and supported lifetime. |
| Warranty | Exact warranty, exclusions and service territory require written confirmation. |
| Configuration and pricing basis | Dated configuration quote required |
| Distributors and service | German office is a commercial contact; exact humanoid dealer appointment and repair scope unverified. |
Public dealer stock labels and demonstration locations are not delivery guarantees.
Specifications
| Height | Unknown |
|---|---|
| Weight | Unknown |
| Payload | Unknown |
| Runtime | Unknown |
| Battery and runtime conditions | No exact K 11 unit battery/power arrangement established. Reported 14-hour working day is not 14-hour battery runtime; no pack scalar assigned. |
| Degrees of freedom | Unknown |
| Max speed | Unknown |
Sources and Further Reading
-
ATOM third-batch shipment and K11 account ↗
DOBOT Robotics · Published Mar 24, 2026 · Accessed Nov 2, 2026
Maker article dated March 24, 2026 reports a third ATOM shipment batch and describes the Shenzhen K11 cinema popcorn application. It does not disclose batch volume, identify the K11 retail variant, or provide independent intervention and uptime logs.
-
Reporter observation of ATOM at Shenzhen K11 cinema ↗
Guangzhou Daily / Dayoo · Published Jan 4, 2026 · Accessed Nov 2, 2026
Reporter Ruan Yuanyuan describes observed popcorn serving, voice ordering and recovery after a container was moved. The article’s 14-hour, 1,000-cup, zero-error site-test claims lack raw logs and power-cycle accounting. They are not a verified single-pack runtime or long-term fleet statistic. Exact ATOM variant remains undisclosed.
-
First ATOM batch delivery at Nagoya launch ↗
DOBOT Robotics · Published Jun 30, 2025 · Accessed Nov 2, 2026
Manufacturer reports the first ATOM batch delivered at the June 27, 2025 Nagoya launch with Japanese integrator ASKA. The article was posted June 30. It does not identify the exact Max, Trainer or II configuration, disclose the batch size, or establish independently audited fleet reliability.
-
Original ATOM pre-sale announcement ↗
DOBOT Robotics · Published Mar 25, 2025 · Accessed Nov 2, 2026
Chinese maker announcement posted March 25 describes the March 18, 2025 ATOM launch and pre-sale starting at CNY 199,000. This is a historical China family offer, without a verified mapping to the K11 unit or today’s Max, W or LUMO configurations. It is not a landed European price.